How They Built the Train from London to Paris: Engineering the Channel Tunnel
The Channel Tunnel connects London and Paris. It measures 31.4 miles in length and was built using tunnel boring machines (TBMs). French and British tunneling teams collaborated effectively. The construction took six years, starting in 1988 and finishing in 1994, enabling fast train travel across the English Channel. The process involved extensive geological surveys and … Read more